The production system of SE “SkhidGZK” brings together mining, processing, chemical and repair facilities in the Dnipropetrovsk and Kirovohrad regions.
Select a numbered marker to view facility details
Inhulska Mine
KropyvnytskyiOperates at two industrial sites. Ore deposits are developed at depths of 60–420 m. Production capacity is 470 thousand tonnes of ore per year.
Learn more about this facility →Smolinska Mine
SmolineLocated near the settlement of Smoline and develops the Vatutinske deposit. Mining depth is 70–640 m.
Learn more about this facility →Novokostiantynivska Mine
Novokostiantynivske depositA key site for expanding the enterprise’s resource base. The project target is 1.5 million tonnes of ore per year, with potential for further capacity growth.
Learn more about this facility →Hydrometallurgical Plant
Zhovti VodyProcesses uranium ore and produces natural uranium concentrate. Ore processing capacity is 1.5 million tonnes per year.
Learn more about this facility →Repair and Mechanical Plant
Zhovti VodyManufactures and repairs mining and custom equipment and drilling tools, and performs repair and installation work for production divisions.
Kamianske Chemical Plant
KamianskeSpecialises in hafnium production. Capacity is up to 12 tonnes of hafnium–nickel master alloy or up to 8 tonnes of metallic hafnium per year.
Learn more about this facility →Safonivske Deposit
Mykolaiv RegionA prospective site within the enterprise’s resource base. Development is planned using in-situ borehole leaching.